march 2015 progress on the canoe yawl

 

The forward mast step has been epoxied into the forefoot, ready to have a mast tube socket connected; the foredeck mast bracing is glued in, ready for said tube, the mizzen mast blocking is also glued in, laminated in two layers of ex Auckland villa Kauri, as are the two centre case bracing struts, and the centreboard and rudder laminates are well under way to being fibreglassed. Yet to finish that ol fairing business outside the hull.. Putting it off for later.